ANALYSIS OF SHORT COMINGS IN COST OPTIMIZATION TECHNIQUES AND DEVELOPING AN EFFECTIVE MODULE FOR ADOPTION

Desai Sai Sankeerth Reddy, S. Anandh

DOI : 10.9780/22307850, By : Laxmi Book Publication

Abstract :

The aim of the present study is to compare social behaviour of player and non player secondary students. To conduct the study, 200 players (Ave. age 13.96 yrs) and 200 non players (Ave. age 14.03 yrs) studying in secondary schools were selected. The criterion for selection of players was participation in district/state level tournaments in any sporting event. Purposive sampling method was used for selection of sample in the present study. To assess social behaviour, Social Skills Problem Behaviour Checklist prepared by Madhu Mathur and Saroj Arora (2005) was used. The results indicate that problematic social behaviour was found to be in more magnitude in players as compared to non players but this fact can not be verified statistically.

Keywords :


    Article :


    Cite This Article :

    Desai Sai Sankeerth Reddy, S. Anandh(2016). ANALYSIS OF SHORT COMINGS IN COST OPTIMIZATION TECHNIQUES AND DEVELOPING AN EFFECTIVE MODULE FOR ADOPTION. Indian Streams Research Journal, Vol. VI, Issue. II, DOI : 10.9780/22307850, http://isrj.org/UploadedData/8032.pdf

    References :

    1. Athanasios P. Chassiakos and Serafim P. Sakellaropoulos (2012), ‘Causes of cost overrun in construction projects’ - Journal of Construction Engineering and Management, Vol.19, No. 4, pp. 651-687.
    2. Daisy X.M. Zheng, S. Thomas Ng and Mohan M. Kumaraswamy (2010), ‘Applying genetic algorithm techniques for time-cost optimization’ - 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol.2, pp. 801-810.
    3. George Otim, Fiona Nakacwa, Michael Kyakula (2006), ‘Cost Control Techniques Used On Building Construction Sites in Uganda’ - Journal of Civil Engineering and Management, Vol Xii, No 3, pp. 221–229.
    4. Homayoun Khamooshi, Ph.D. and Denis F. Cioffi, Ph.D. (2013), ‘Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling’ - J. Constr. Eng. Manage. 2013.139: pp. 488-49.
    5. Mehmet EmreBayraktar A, MakarandHastak M, SanjivGokhale, and Bhavin Safi (2011), ‘Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects’ - J. Constr. Eng. Manage, pp.645-655.
    6. Athanasios P. Chassiakos and Serafim P. Sakellaropoulos (2012), ‘Causes of cost overrun in construction projects’ - Journal of Construction Engineering and Management, Vol.19, No. 4, pp. 651-687.
    7. Daisy X.M. Zheng, S. Thomas Ng and Mohan M. Kumaraswamy (2010), ‘Applying genetic algorithm techniques for time-cost optimization’ - 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol.2, pp. 801-810.
    8. George Otim, Fiona Nakacwa, Michael Kyakula (2006), ‘Cost Control Techniques Used On Building Construction Sites in Uganda’ - Journal of Civil Engineering and Management, Vol Xii, No 3, pp. 221–229.
    9. Homayoun Khamooshi, Ph.D. and Denis F. Cioffi, Ph.D. (2013), ‘Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling’ - J. Constr. Eng. Manage. 2013.139: pp. 488-49.
    10. Mehmet EmreBayraktar A, MakarandHastak M, SanjivGokhale, and Bhavin Safi (2011), ‘Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects’ - J. Constr. Eng. Manage, pp.645-655.
    11. Mehmet EmreBayraktar A, MakarandHastak M, SanjivGokhale, and Bhavin Safi (2011), ‘Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects’ - J. Constr. Eng. Manage, pp.645-655.
    12. Athanasios P. Chassiakos and Serafim P. Sakellaropoulos (2012), ‘Causes of cost overrun in construction projects’ - Journal of Construction Engineering and Management, Vol.19, No. 4, pp. 651-687.
    13. Daisy X.M. Zheng, S. Thomas Ng and Mohan M. Kumaraswamy (2010), ‘Applying genetic algorithm techniques for time-cost optimization’ - 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol.2, pp. 801-810.
    14. George Otim, Fiona Nakacwa, Michael Kyakula (2006), ‘Cost Control Techniques Used On Building Construction Sites in Uganda’ - Journal of Civil Engineering and Management, Vol Xii, No 3, pp. 221–229.
    15. Homayoun Khamooshi, Ph.D. and Denis F. Cioffi, Ph.D. (2013), ‘Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling’ - J. Constr. Eng. Manage. 2013.139: pp. 488-49.
    16. Athanasios P. Chassiakos and Serafim P. Sakellaropoulos (2012), ‘Causes of cost overrun in construction projects’ - Journal of Construction Engineering and Management, Vol.19, No. 4, pp. 651-687.
    17. Daisy X.M. Zheng, S. Thomas Ng and Mohan M. Kumaraswamy (2010), ‘Applying genetic algorithm techniques for time-cost optimization’ - 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol.2, pp. 801-810.
    18. George Otim, Fiona Nakacwa, Michael Kyakula (2006), ‘Cost Control Techniques Used On Building Construction Sites in Uganda’ - Journal of Civil Engineering and Management, Vol Xii, No 3, pp. 221–229.
    19. Homayoun Khamooshi, Ph.D. and Denis F. Cioffi, Ph.D. (2013), ‘Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling’ - J. Constr. Eng. Manage. 2013.139: pp. 488-49.
    20. Mehmet EmreBayraktar A, MakarandHastak M, SanjivGokhale, and Bhavin Safi (2011), ‘Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects’ - J. Constr. Eng. Manage, pp.645-655.
    21. George Otim, Fiona Nakacwa, Michael Kyakula (2006), ‘Cost Control Techniques Used On Building Construction Sites in Uganda’ - Journal of Civil Engineering and Management, Vol Xii, No 3, pp. 221–229.
    22. Homayoun Khamooshi, Ph.D. and Denis F. Cioffi, Ph.D. (2013), ‘Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling’ - J. Constr. Eng. Manage. 2013.139: pp. 488-49.
    23. Mehmet EmreBayraktar A, MakarandHastak M, SanjivGokhale, and Bhavin Safi (2011), ‘Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects’ - J. Constr. Eng. Manage, pp.645-655.
    24. Athanasios P. Chassiakos and Serafim P. Sakellaropoulos (2012), ‘Causes of cost overrun in construction projects’ - Journal of Construction Engineering and Management, Vol.19, No. 4, pp. 651-687.
    25. Daisy X.M. Zheng, S. Thomas Ng and Mohan M. Kumaraswamy (2010), ‘Applying genetic algorithm techniques for time-cost optimization’ - 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol.2, pp. 801-810.
    26. Athanasios P. Chassiakos and Serafim P. Sakellaropoulos (2012), ‘Causes of cost overrun in construction projects’ - Journal of Construction Engineering and Management, Vol.19, No. 4, pp. 651-687.
    27. Daisy X.M. Zheng, S. Thomas Ng and Mohan M. Kumaraswamy (2010), ‘Applying genetic algorithm techniques for time-cost optimization’ - 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, Vol.2, pp. 801-810.
    28. George Otim, Fiona Nakacwa, Michael Kyakula (2006), ‘Cost Control Techniques Used On Building Construction Sites in Uganda’ - Journal of Civil Engineering and Management, Vol Xii, No 3, pp. 221–229.
    29. Homayoun Khamooshi, Ph.D. and Denis F. Cioffi, Ph.D. (2013), ‘Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling’ - J. Constr. Eng. Manage. 2013.139: pp. 488-49.
    30. Mehmet EmreBayraktar A, MakarandHastak M, SanjivGokhale, and Bhavin Safi (2011), ‘Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects’ - J. Constr. Eng. Manage, pp.645-655.

    Article Post Production

      No data exists for the row/column.
    Creative Commons License
    Indian Streams Research Journal by Laxmi Book Publication is licensed under a Creative Commons Attribution 4.0 International License.
    Based on a work at http://oldisrj.lbp.world/Default.aspx.
    Permissions beyond the scope of this license may be available at http://oldisrj.lbp.world/Default.aspx
    Copyright © 2014 Indian Streams Research Journal. All rights reserved
    Looking for information? Browse our FAQs, tour our sitemap, or contact ISRJ
    Read our Privacy Policy Statement and Plagairism Policy. Use of this site signifies your agreement to the Terms of Use